Egypt: Alexandria Marine Lift & Dry Dock Facility
Cimmaron International Corporation supplied the fire fighting system, special salt water fire pump, as well as motor control center for this project.
Cimmaron International Corporation supplied the fire fighting system, special salt water fire pump, as well as motor control center for this project.
Cimmaron International Corporation was chosen to supply sinks and drain assemblies.
Cimmaron International Corporation supplied communication infrastructure materials for this project.
Cimmaron International Corporation supplied generators and light fixtures, grilles, diffusers, fuel separators, strainers hydrant valves.
Cimmaron International Corporation supplied HVAC equipment and accessories, pipes, valves, fittings, light fixtures, generators, transformers, conduit, wire, cable, pumps and plumbing fixtures.
Cimmaron International Corporation has been chosen as a major supplier for this recently completed project. Having supplied, among others, air conditioning equipment, grilles and diffusers, copper pipes and fittings, cast iron pipes and fittings. Chilled…
Cimmaron International Corporation was chosen to supply above ground steel fuel storage tanks (1,600,000 liter capacity), underground double wall steel fuel storage tanks (up to 50,000 gallon capacity), filter separartors, fuel control valves, fuel strainers,…
Cimmaron International Corporation supplied lighting poles and fixtures.
The Pearl, a multi billion US dollar man made island covering 985 acres of reclaimed land offshore the Arabian Peninsula state of Qatar. Cimmaron International Corporation is one of the successful suppliers to this prestigeous…
Cimmaron International Corporation was chosen to supply kitchen and bathroom sinks as well as accessories, showerheads and shower accessories, as well as other plumbing accessories for this project.